Solar Panel Installation in Palo Alto, CA
Nabu Energy LLC | CSLB License #1052356 | C-10 Electrical Contractor
Considering solar panel installation in Palo Alto, CA? We help homeowners and businesses explore solar PV systems, battery storage, and EV charging based on their electricity use and property requirements. We consider roof suitability, electrical infrastructure, CPAU billing arrangements, and the City’s installation and permitting requirements when evaluating a project.
CTA destinations:
- Zero Sales CommissionNo commissioned salespeople on your project
- In-House TeamDesign, permitting and installation by our own crews
- Licensed C-10 ContractorCSLB #1052356
- Solar, Battery and EVOne installer for the whole system
Solar, Battery, and EV Charger Installation Services in Palo Alto
Residential solar panel installation in Palo Alto involves more than determining how many panels will fit on a roof. Electricity use, roof condition, available sunlight, electrical infrastructure, utility billing arrangements, and future energy needs all play a part in system design.
Palo Alto is served by its own municipal electricity utility, City of Palo Alto Utilities (CPAU). Its solar billing and export compensation arrangements differ from those of investor-owned utilities such as Pacific Gas and Electric Company (PG&E). Understanding which utility serves your property and which program applies is an important first step when considering solar.
We provide solar PV system design and installation, battery storage, and EV charging services for residential and commercial properties, depending on project requirements and service availability.
For each contracted project, our process may include a property assessment, system design, a written proposal, permitting and utility coordination, installation, inspections, and the required interconnection steps.

Why Consider Solar for Your Palo Alto Property?
Solar may be worth considering if you want to generate electricity at your property and understand how doing so could affect your electricity use and utility bill.
In Palo Alto, the decision also involves CPAU’s electricity rates and export compensation arrangements. Your roof, electricity use, and energy needs help determine whether a solar-only or solar-plus-battery system makes sense for your property.
Assess Your Roof and Available Sunlight
Roof orientation, shading, usable roof area, structural condition, and existing equipment can all affect the design and performance of a rooftop solar system.
Read moreRead less
Palo Alto has a variety of residential properties, including Eichler homes with distinctive roof designs. These architectural features may affect where panels can be placed and how the system is laid out.
For properties in designated Eichler neighborhoods, the City’s Eichler Neighborhood Design Guidelines recommend minimizing the visual impact of rooftop solar panels. They discuss placement along existing roof slopes and low-profile installations where appropriate. These guidelines provide design guidance; confirm any property-specific requirements with the City.
A property assessment helps us determine whether your roof is suitable for solar, whether shading needs to be addressed, and whether repairs are needed before installation.
Roof repairs are outside our C-10 electrical contractor classification. Any required roofing work must be evaluated and performed by an appropriately licensed contractor.
Official reference: City of Palo Alto – Eichler Neighborhood Design Guidelines
Understand Your Electricity Usage
How much electricity you use throughout the day helps determine the right solar system size for your property.
Read moreRead less
Reviewing your utility bill can help us identify your usage patterns, applicable rates, and how much electricity your property may be able to use directly from the solar system.
This is particularly important in Palo Alto because electricity exported to the grid under CPAU’s NEM 2 program receives compensation under the EEC-1 rate rather than the retail electricity rate.
Comparing your electricity use with expected solar generation helps us develop a suitable system design.
Consider Battery Storage
Solar panels generate electricity when sunlight is available. A battery stores some of that electricity so you can use it later.
Read moreRead less
Battery storage may help you use more of your solar generation after sunset. With compatible backup equipment, it may also provide power to selected circuits during a utility outage.
Whether a battery makes financial or practical sense depends on your electricity use, CPAU billing arrangements, battery capacity, system configuration, installation cost, and backup-power needs.
Backup power is not guaranteed during every outage. How long it is available depends on the system configuration, battery capacity, inverter, backed-up circuits, and connected loads.
Plan for Electric Vehicle Charging
If you own or plan to purchase an electric vehicle, it may be helpful to consider your charging needs alongside your solar and electrical system.
Read moreRead less
Before installing an EV charger, we assess the charger type, charging schedule, available electrical capacity, wiring requirements, and whether an electrical panel upgrade may be necessary.
Planning solar and EV charging together helps you understand how electricity generation, vehicle charging, and household consumption may interact.
Solar and Energy Solutions Available in Palo Alto
The right combination of solar, battery storage, and electrical services depends on your property, electrical needs, and project goals.

Residential Solar Panel Installation
A residential solar PV system converts sunlight into electricity that your home can use.
Read moreRead less
When designing a system, we consider your electricity use, roof layout, shading, equipment specifications, and applicable electrical and permitting requirements.
For Palo Alto homes, the proposed system also needs to account for CPAU’s NEM 2 billing arrangements and EEC-1 export compensation.
We size each proposed system around your energy needs and available roof area. We do not assume that solar will eliminate your electricity bill.
Internal link: Solar and Energy Solutions – confirm the most relevant residential solar service destination before publishing.

Solar Battery Installation and Storage
A home battery stores electricity for use at another time. Depending on the system configuration, it may help you use more of your solar generation after sunset and provide backup power to selected circuits during a grid outage.
Read moreRead less
A standard grid-connected solar system generally shuts down during a utility outage for safety. Solar panels alone do not normally keep a standard grid-connected system operating during an outage.
For Palo Alto properties, battery planning should also account for CPAU’s NEM 2 program and the value of using generated electricity onsite rather than exporting it.
If you want to add battery storage to an existing solar system, we first assess the equipment already in place. We also need to consider equipment compatibility, electrical requirements, applicable permits, and utility approvals. Changes to an interconnected system may affect how it is treated under the utility’s billing rules.
Internal link: Solar and Energy Solutions – confirm the most relevant battery service destination before publishing.

Commercial Solar PV Systems in Palo Alto
Businesses may consider solar PV systems to generate electricity for their operations and make use of suitable roof or other approved installation areas.
Read moreRead less
When assessing a commercial solar project, we consider:
- Operating hours and electricity consumption patterns.
- Existing electricity rates and applicable utility arrangements.
- Roof condition and available installation areas.
- Electrical infrastructure and service capacity.
- Site accessibility and installation requirements.
- Proposed system size, equipment, and project economics.
Commercial solar projects in Palo Alto must follow the applicable City permitting and utility interconnection requirements. The residential SolarAPP+ pathway does not cover commercial installations.
We estimate system size, expected generation, and potential financial outcomes using actual site and utility information.

EV Charger Installation in Palo Alto
An EV charging installation should account for your vehicle, charging schedule, and property’s electrical capacity.
Read moreRead less
Before installation, we assess the charger type, available electrical capacity, wiring requirements, and whether a panel upgrade or additional electrical work is necessary.
Pairing an EV charger with solar may be worth considering, but the amount of vehicle charging supplied by solar depends on generation, charging times, household electricity demand, and any battery configuration.
Residential EV charging installations in Palo Alto are subject to the City’s applicable permitting requirements.

Electrical Panel Upgrades and Related Work
Some solar, battery storage, and EV charging projects require changes to the existing electrical infrastructure.
Read moreRead less
We assess your current electrical panel and service capacity to determine whether they are suitable for the proposed equipment.
Any upgrade must meet the project’s technical requirements and applicable electrical codes. Additional permitting and inspections may apply.

City of Palo Alto Utilities, Solar Billing, and Electricity Credits
Understanding your electricity provider’s billing arrangements is an important part of evaluating solar panel installation in Palo Alto.
The City of Palo Alto operates its own municipal electricity utility, City of Palo Alto Utilities (CPAU). Its solar billing arrangement is separate from those of investor-owned utilities such as PG&E.
Check your current electricity statement to confirm your provider and applicable rate before making a system or financial decision.
How Solar Generation Affects Your Electricity Bill
Electricity generated by your solar system can first serve your property’s electricity demand.
Read moreRead less
When your solar system produces more electricity than your property is using at that moment, excess electricity may be exported to the utility grid, depending on the system configuration and interconnection arrangement.
When your property needs more electricity than the solar system is generating, it imports electricity from the grid.
The financial value of exported electricity depends on the applicable utility tariff and its export compensation rules. Export credits should not automatically be assumed to equal the retail price you pay for electricity.
Understanding Palo Alto’s NEM 2 Program
City of Palo Alto Utilities offers its Net Energy Metering (NEM) 2 program to new rooftop solar customers.
Read moreRead less
CPAU’s original NEM 1 program reached its capacity limit at the end of 2017. New solar customers who did not qualify for the earlier program are generally served under NEM 2.
Under CPAU’s NEM 2 program:
- Electricity generated by your solar system first serves your property’s immediate electricity demand.
- Electricity exported to the grid is measured separately from electricity imported from the grid.
- Imported electricity is billed at your applicable retail electricity rate.
- Exported electricity receives compensation under the Export Electricity Compensation (EEC-1) rate.
The EEC-1 rate is generally lower than the retail electricity rate. This is partly because exported electricity does not include all the costs associated with delivering electricity through the utility’s distribution system.
Your CPAU bill identifies the export credit as “EEC-1 Solar Export Credit” in the electricity section.
When planning a new solar installation, it is important to understand the difference between using electricity onsite and exporting it to the grid. This can help inform decisions about system size and battery storage.
Official resource: City of Palo Alto – Net Energy Metering (NEM) 2
Does NEM 3.0 Apply to Palo Alto?
California’s Net Billing Tariff (NBT), also known as the Solar Billing Plan or NEM 3.0, applies to qualifying new solar interconnections under the applicable rules of participating investor-owned utilities regulated by the California Public Utilities Commission.
Read moreRead less
City of Palo Alto Utilities operates its own NEM program. The state’s Net Billing Tariff does not replace CPAU’s NEM 2 program.
This means PG&E’s NEM 3.0 export compensation assumptions should not automatically be applied to a property served by CPAU. We confirm the utility provider and applicable rate when assessing a solar project.
Official resource: California Public Utilities Commission – Net Energy Metering and Net Billing
Review Your Electricity Bill Before Choosing a System
Before estimating the potential financial impact of a solar installation, review:
Read moreRead less
- Your electricity usage and billing history.
- Your current CPAU electricity rate.
- Your electricity consumption during solar generation hours.
- The amount of electricity expected to be used onsite.
- Expected solar generation and possible grid exports.
- Battery operation, if storage is included.
- Any remaining utility charges under the applicable rate schedule.
The effect on your bill depends on usage patterns, rate schedules, system performance, export compensation, and utility rules. Results may change over time.
Official resources:
Solar Permits and Installation Requirements in Palo Alto
Solar installations within Palo Alto city limits must comply with the City’s applicable building, electrical, and permitting requirements.
The City requires a PV permit for solar installations and final approval before the system is operated. City of Palo Alto Utilities manages the utility interconnection agreement and solar billing arrangements, while the City’s Development Services Department processes building permits and inspections.
The utility interconnection agreement and the City’s building permit are separate approvals.
SolarAPP+ Eligibility in Palo Alto
The City of Palo Alto offers SolarAPP+ for eligible residential rooftop solar projects.
Read moreRead less
SolarAPP+ is an automated code-compliance review pathway for qualifying solar installations. It can streamline the permitting process, but approval through SolarAPP+ does not replace the separate City building permit application.
The City’s published eligibility conditions include:
- Single-family residential properties.
- Roof-mounted solar systems.
- New systems rather than upgrades or additions.
- PV systems of 38.4 kW or less.
- Energy storage systems of 38.4 kW or less when included in an eligible combined project.
- Electrical service of 400 amps or less.
- A 225-amp service disconnect switch.
- 225-amp busbars.
SolarAPP+ cannot currently accommodate certain projects, including:
- Homes listed on the City’s Historic Registry.
- Standalone energy storage systems.
- Ground-mounted solar systems.
- Building-integrated photovoltaic systems.
- Electrical service panel upgrades.
- Multifamily, commercial, community, and utility-scale projects.
Projects that do not meet the published requirements must follow the City’s conventional building permit process. Check the City’s current requirements before selecting a permit pathway.
For an eligible project, the process includes obtaining CPAU interconnection approval, completing the SolarAPP+ review, and submitting the required documents through the City’s permit portal to obtain the building permit before installation begins.
Official resource: City of Palo Alto – Apply for a Residential SolarAPP+ Permit
CPAU Utility Interconnection and City Approval
For an eligible residential SolarAPP+ project, approval of the City of Palo Alto Utilities interconnection agreement is an important initial step.
Read moreRead less
The utility application may require:
- A site plan showing the main electrical panel and AC disconnect.
- An elevation plan showing the location of other utilities.
- A three-line electrical diagram.
- PV, energy storage system (ESS), and inverter manufacturer technical data sheets.
- A completed and signed utility interconnection agreement.
After CPAU approves the interconnection agreement, the project can proceed through the applicable SolarAPP+ review and City building permit application steps.
For projects following the conventional permitting pathway, the City may require additional plans, electrical documentation, equipment specifications, and other supporting information.
The required sequence and approvals depend on the permit pathway. The process generally includes utility interconnection review, the applicable City permit review, installation, required inspections, and final utility authorization. The City also requires the CPAU meter inspection to be scheduled before the final building inspection.
The system must not be operated until the required inspections and final interconnection approval, also known as Permission to Operate, have been received.
Battery storage, electrical panel upgrades, commercial installations, and other associated electrical work may require additional permits and inspections.
For contracted projects, we coordinate the required permitting documentation and utility interconnection process. The relevant authorities make the final permit, inspection, and interconnection decisions. Your project contract explains the responsibilities of our team, you as the customer, the utility, and the permitting authority.
Official resources:
Our Solar Installation Process in Palo Alto
Every property has different requirements. We follow a clear process to understand your needs, develop a proposed system, coordinate approvals, and complete the installation.
Step 1 – Property Review
We review your electricity usage, roof condition, available installation area, electrical infrastructure, and project goals.
Read moreRead less
For Palo Alto properties, we also consider the applicable CPAU electricity rate and utility interconnection requirements.
Step 2 – System Design
We develop a proposed solar PV and battery configuration based on your property’s requirements, equipment specifications, roof layout, and electrical design.
Read moreRead less
We also account for your electricity consumption and whether the project includes battery storage or EV charging.
Step 3 – Written Proposal
We provide a written proposal outlining the proposed equipment, system configuration, installation scope, pricing, and applicable project terms.
Read moreRead less
The proposal also explains which permitting, utility coordination, and other responsibilities are included in the agreement.
Step 4 – Permitting and Utility Coordination
We prepare and coordinate the documentation required for the applicable City permit pathway and CPAU interconnection process.
Read moreRead less
This may involve utility pre-approval, SolarAPP+ review where eligible, conventional permit submissions, and other required documentation.
Step 5 – Installation
Once the necessary approvals and project preparations are complete, our team carries out the installation according to the approved design and applicable requirements.
Step 6 – Inspection and Authorization
We coordinate the required inspections and utility approval steps.
Read moreRead less
The solar system must not be operated until the required inspections, approvals, and Permission to Operate have been received.
The project timeline depends on system design, permitting, equipment availability, installation complexity, inspection scheduling, and utility approval. Once we have assessed the project, we can provide a more specific schedule.
Solar Installation Costs, Financing, and Incentives in Palo Alto
The cost of solar panel installation in Palo Alto depends on the design and requirements of each property.
To prepare a useful estimate, we consider electricity consumption, proposed system size, roof condition, equipment specifications, electrical work, battery storage, and applicable permitting and interconnection requirements.
What Affects the Cost of Solar Installation?
Factors that can influence your quote include:
Read moreRead less
- Proposed solar system size and equipment.
- Roof layout, accessibility, and condition.
- Electrical panel capacity and any necessary upgrades.
- Battery storage capacity and configuration.
- EV charger installation or other electrical work.
- Permitting, inspection, and interconnection requirements.
- Project complexity and installation conditions.
Your written proposal should clearly describe the proposed equipment, included work, exclusions, pricing, and applicable terms.
Solar Panels With or Without a Battery
A solar-only system and a solar-plus-battery system have different costs and operating characteristics.
Read moreRead less
A battery adds equipment and installation costs, but it may give you more flexibility in how you use electricity and provide backup power when designed and approved for that purpose.
For Palo Alto properties, the comparison should also account for CPAU’s NEM 2 program and the EEC-1 export compensation rate.
The right configuration depends on your electricity use, the amount of energy consumed onsite, expected grid exports, upfront costs, and backup-power needs.
Financing and Payment Options
Payment and financing arrangements depend on the project and the options available to you.
Read moreRead less
We are not a lender. Any financing arranged through a third-party provider is subject to that provider’s approval requirements and terms. Confirm availability and conditions before relying on a financing option.
Cash Purchase
With a cash purchase, you pay for the solar and battery installation directly. Review the written proposal to understand the total price, equipment, installation scope, warranties, and payment schedule.
Loan Financing
Loan financing may be available through independent third-party providers, depending on the project and your eligibility.
Read moreRead less
Before signing, review the interest rate, loan term, total repayment obligation, fees, and other financing conditions. The financing provider determines approval and loan terms.
Prepaid Power Purchase Agreement (PPA)
If a prepaid power purchase agreement is offered for your project, it may involve a third-party system owner and different payment, ownership, and contractual arrangements.
Read moreRead less
Before entering into a PPA, review who owns the system, what electricity payments or obligations apply, the contract term, maintenance responsibilities, warranty arrangements, and any conditions that may apply if you sell your property.
Only consider this option if it is available for your project and you have received the full contract terms for review.
Federal Solar Tax Credits and Other Incentives
Federal, state, local, and utility incentive programs have separate eligibility requirements, deadlines, and restrictions.
Read moreRead less
Under current federal law, the Residential Clean Energy Credit under Section 25D is not available for expenditures made after December 31, 2025. The credit should therefore not be presented as an available benefit for new residential solar or battery installations completed in 2026.
Other state, local, or utility programs may have separate requirements. Check current eligibility and availability with the relevant official program before including an incentive in your financial calculations.
We do not provide tax advice. Consult a qualified tax professional about your individual tax circumstances and any applicable tax treatment.
Official resource: Internal Revenue Service – Residential Clean Energy Credit
Understanding Potential Electricity Bill Outcomes
The effect on your electricity bill depends on actual solar generation, electricity consumption, CPAU rates, EEC-1 export compensation, equipment costs, and the selected payment arrangement.
Read moreRead less
Under Palo Alto’s NEM 2 program, electricity used onsite and electricity exported to the grid have different financial values. Battery storage may change how much electricity you use onsite versus export.
Any estimate should be based on your property’s information and applicable utility arrangements. Actual results may differ from projections, and no specific savings or payback period is guaranteed.
Why Choose Us for Your Palo Alto Project?
When choosing a solar installer, it is important to understand the proposed system, who will coordinate the work, the contractor’s credentials, and the terms of the agreement.
In-House Design and Installation
We handle our projects in-house, from system design through installation, with our own team coordinating the work rather than subcontracted crews.
Zero Sales Commissions
Our sales staff do not earn commissions. We work directly with you and explain the proposed solar system, equipment, pricing, and installation requirements.
Read moreRead less
You have the opportunity to discuss your property’s needs and understand the proposed system before making a decision.
Licensed California Electrical Contractor
Our company, Nabu Energy LLC, holds CSLB License #1052356, classified as a C-10 Electrical Contractor.
Read moreRead less
You can check our license status and classification through the California Contractors State License Board before entering into a contract.
All contracted work is subject to the applicable license classification, project requirements, and California regulations.
License verification: California Contractors State License Board – Check a License
Clear Scope, Coordination, and Contract Terms
Before proceeding, you should receive a clear explanation of the proposed system design, equipment specifications, included work, exclusions, project pricing, warranties, payment terms, and next steps.
Read moreRead less
For contracted projects, we coordinate the applicable permitting documentation, utility interconnection, and installation activities.
Your project contract explains the responsibilities of our team, you as the customer, the utility, and the permitting authority. We want you to understand the proposed work and each party’s responsibilities before installation begins.
Your Rights as a California Solar Customer
California has consumer protection requirements for residential solar installations. Understanding the required disclosures, contract terms, and cancellation rights can help you make an informed decision.
Read moreRead less
Solar Energy System Disclosure Document
California law requires a Solar Energy System Disclosure Document for covered residential solar system sales, financing, and lease agreements.
The document must appear on the front page or cover page of the applicable solar contract and provide important information, including:
- Total system costs and payment obligations, including financing costs.
- Information about how and where to submit a contractor complaint.
- The consumer’s applicable right to cancel the contract.
- Other disclosures and information required for the transaction.
The disclosure document and contract must follow applicable California requirements, including language requirements for covered transactions.
Written Contract and Cancellation Rights
Review the written agreement before signing. It should clearly explain the equipment, installation scope, total price, payment arrangements, warranties, responsibilities, and applicable cancellation terms.
California provides cancellation rights for qualifying home improvement and residential solar transactions. The applicable cancellation period depends on the transaction and circumstances.
For certain qualifying contracts negotiated away from the contractor’s place of business, homeowners aged 65 or older have a five-business-day cancellation period.
Review the Solar Energy System Disclosure Document and Notice of Cancellation included with your contract. Follow the notice’s instructions and confirm the cancellation period that applies to your transaction.
Contractor Complaints and License Verification
You can check a contractor’s license through the California Contractors State License Board.
For contractor-related complaints or consumer assistance, contact:
California Contractors State License Board (CSLB) Website: https://www.cslb.ca.gov/ Phone: 800-321-CSLB (2752)
You can also review the CSLB’s official Solar Requirements and Consumer Information before entering into a residential solar agreement.
Frequently Asked Questions About Solar Installation in Palo Alto, CA
Does Palo Alto use PG&E or its own electric utility?
The City of Palo Alto operates its own municipal electricity utility, City of Palo Alto Utilities (CPAU). Most Palo Alto properties served by CPAU follow its utility billing and solar interconnection requirements rather than PG&E’s solar billing programs. Check your electricity bill to confirm your provider.
Does NEM 3.0 apply to solar installations in Palo Alto?
No. CPAU operates its own Net Energy Metering (NEM) 2 program. California’s NEM 3.0 Net Billing Tariff applies to qualifying customers of participating investor-owned utilities, such as PG&E. New solar customers served by CPAU are generally covered by its NEM 2 program.
How does CPAU compensate homeowners for excess solar electricity?
Under CPAU’s NEM 2 program, electricity exported to the grid receives a credit under the Export Electricity Compensation (EEC-1) rate. Electricity imported from the grid is billed at the applicable retail rate. Because the export credit is generally lower than the retail rate, using more of your solar electricity onsite can be an important part of system planning.
Can my Palo Alto home qualify for the SolarAPP+ permitting process?
Some Palo Alto homes qualify for SolarAPP+, the City’s automated permitting pathway for eligible residential rooftop solar projects. Eligibility depends on the property, system type, equipment size, and electrical configuration. Historic Registry homes, ground-mounted systems, standalone batteries, and electrical panel upgrades are among the project types that cannot use the current SolarAPP+ pathway. Check the City’s current SolarAPP+ requirements before choosing a permit process.
Can solar panels be installed on Eichler or historic homes in Palo Alto?
Solar installation may be possible, but the roof design and any applicable architectural requirements need to be reviewed. The City’s Eichler Neighborhood Design Guidelines recommend minimizing the visual impact of solar panels and considering low-profile placement along existing roof slopes. These guidelines provide design guidance. Homes listed on the City’s Historic Registry are not eligible for the current SolarAPP+ pathway and may require conventional permitting and additional historic preservation review.
Do I need a battery with solar panels in Palo Alto?
No. A battery is not required for every solar installation. Under CPAU’s NEM 2 program, exported electricity receives EEC-1 compensation, which is generally lower than the retail electricity rate. A battery may help store excess solar generation for later use, but its suitability depends on your electricity use, battery cost, system configuration, and backup-power needs.
Can I add battery storage to my existing solar system in Palo Alto?
A battery may be added to an existing solar system, subject to equipment compatibility, electrical requirements, and applicable City permits and utility approvals. Changes to an interconnected system may also affect its treatment under CPAU’s billing rules. We would need to review your existing equipment and utility arrangement before planning a battery addition.
Will solar panels provide power during a Palo Alto power outage?
A standard grid-connected solar system generally shuts down during a utility outage for safety. Solar panels may provide power to selected circuits during an outage when paired with compatible battery storage and properly configured backup equipment. Backup availability and duration depend on battery capacity, inverter configuration, available solar generation, and the connected loads.
Explore Solar Options for Your Palo Alto Property
Every property has different energy needs. We can assess your electricity use, roof, electrical infrastructure, utility billing arrangements, and project goals to help determine whether solar panels, battery storage, or EV charging may be suitable.
Contact us to discuss your Palo Alto project and request a quote tailored to your property.
Important Information
The information on this page is for general purposes only and does not constitute design or financial advice, a project proposal, or a guarantee of savings or system performance.
Actual solar generation, battery performance, utility credits, costs, and permitting requirements depend on property conditions, equipment, utility tariffs, and applicable regulations. Nabu Energy has no control or influence over utility credits, permitting decisions or code requirements established by Authorities Having Jurisdiction (AHJs), or any other rebates.
All project details, pricing, financing, and installation schedules are subject to individual assessment and written agreement. Utility rates, incentives, and regulations may change. Customers should verify current requirements before making a decision.