Areas We Serve in the Bay Area

Local solar installers across the Bay Area

Nabu Energy is headquartered at 39899 Balentine Dr #200 in Newark, California, and works across the East Bay, the South Bay, the Peninsula and Marin from there. Rooftop solar, home battery storage, EV charger installation and main service panel upgrades are all delivered by our own employees, and no sales commission is built into the price.

Our service radius

One office, one set of crews

Every city below is covered by the same team that works out of Newark. Fremont has its own page covering the permit route, the electricity provider and what changes locally. Guides for the other cities will follow.

Cities we cover

Pick your city

Fremont

Solar, battery storage and EV chargers for Fremont homes, permitted with the City of Fremont.

Newark

Our own city. The office is on Balentine Drive, a few minutes from most Newark addresses.

Union City

SolarAPP+ with a local caveat, and Ava Community Energy on the supply side.

Solar panel installation in Union City →

Hayward

A plan-check city rather than an instant-permit city, so the sequence is planned around that.

Pleasanton

Renewable 100 billing and a two-part permit process through Accela Citizen Access.

Dublin

A city where many roofs already carry an array, so the work is often storage and panel upgrades.

Milpitas

SolarAPP+ for eligible systems, with storage sized around evening use.

San Jose

An online permit where the roof qualifies, and a bracket inspection before a battery goes on.

Sunnyvale

Near-instant permitting for eligible rooftop work, plus the panel upgrades behind it.

Santa Clara

A city-owned utility, so the utility approves the system before the city does.

Livermore

An inland city with online-only residential permits and a job packet the city checks at final.

San Leandro

Instant permits since 2024, once you confirm the home is inside city limits.

Cupertino

Eichler roofs take their own permit route, and the instant permit is on hold for now.

Oakland

Same-day permits in the flats and a widened fire zone in the hills.

Palo Alto

A city-owned utility with its own NEM 2 program, so interconnection comes before the permit.

Los Altos

SolarAPP+ permits issued on payment, and 8 of 11 solar permits in one recent month included backup.

Los Altos Hills

Acre lots open up ground mounts, and batteries share the solar permit.

Saratoga

Express permits through Symbium for solar, storage, panels and chargers.

Los Gatos

Two permit lanes, four historic districts and a foothill fire zone.

Atherton

Heritage oaks shape the design long before the roof does.

Portola Valley

A three-day expedited permit with Woodside Fire review.

Hillsborough

Roof solar skips design review, and the Town runs an automated permit route.

Stinson Beach

Marin County online permits, MCE credits and the coastal zone.

Where we are

Nabu Energy, Newark, California

39899 Balentine Dr #200, Newark, California 94560. Requesting an assessment does not commit you to anything.

Ask for an assessment

If your city is not listed above, call and ask. The crews work the 680 and 880 corridors, and the answer is usually yes.